The Jasiri Project is one of Mwamba’s flagship gold developments within Tanzania’s Lake Victoria Goldfields, a world-class Archean greenstone province that also hosts the 6.3-Moz Geita mine. Jasiri lies along the same north–south mineralized corridor, where banded iron formations and sheared mafic volcanics define a continuous gold-bearing system. Over 37,000 metres of historical and recent drilling have confirmed multiple stacked ore zones, forming a coherent pit-constrained resource that remains open along strike and at depth.
Current modeling outlines approximately 147,000 recoverable ounces of gold within a defined open-pit shell, averaging 1.47 g/t Au at a 0.5 g/t cut-off. The resource demonstrates strong grade continuity, with a high-grade core surrounded by broader lower-grade envelopes in a classic BIF-hosted lode geometry suited to staged open-pit and underground expansion. Metallurgical testing indicates free-milling ore with recoveries exceeding 90%, confirming suitability for conventional gravity and CIL processing.
With an anticipated all-in sustaining cost (AISC) of roughly US $1,300 per ounce, Jasiri represents a scalable, low-cost gold project supported by pre-existing grid power, established roads, and an operating processing plant nearby. Ongoing drilling and modeling aim to extend the resource base and unlock the deeper potential beneath the initial pit shell.


